Hot water jet is ready for drilling.


The drilling system is in action.


Materials transported by a helicopter.


High pressure hot water machines.


Lowering down the drilling hose using a winch.


We won this 500-m deep borehole after 10 days full day work.


Getting out the hose from the borehole.


The jet nozzle knows the bed of the glacier.


What a wonderful team we were.

RETURN